
Foundation Fieldbus Linking Device 13
Publication
1757-IN021E-EN-P - August 2009
3. Complete step 1 and step 2 for all H1 cables.
4. Insert the RTB into the corresponding socket.
H1 Terminal Block Layout (catalog number 1757-FFLD4 shown)
Power and Grounding
1. Connect the chassis ground to connector 1 - CHASSIS GND.
2. Connect the 24V common to connector 2 - DC GND.
3. Connect the +24V DC input power to connector 3 - 24V DC (
+20%).
4. Apply power to the linking device.
You must use a power conditioner between your fieldbus power supply and
the devices on the fieldbus network. For more information, see the
F
OUNDATION Fieldbus specifications at http://www.fieldbus.org,
publication AG-140
Do not exceed 10 m (32.8 ft) total wiring length on the 24V DC power
connection.
H1-1
+ -+ -+ -+ -+ -+ -+ -+ -
H1-2 H1-3 H1-4
1
CHASSIS GND
2
DC Gnd
3
24V DC (+
20%)
43576
Comentários a estes Manuais