USER’S GUIDE
Scheduler
PUBLICATION SCHED-UM001F-EN-E–August 2007
Supersedes Publication SCHED-UM001E-EN-P
Production Management
INTEGRATED PRODUCTION & PERFORMANCE SUITE
SCHED-UM001F-EN-E 5/2/07 9:10 AM Page 1
Vista de página 0
1 2 3 4 5 6 ... 145 146

Resumo do Conteúdo

Página 1 - Scheduler

USER’S GUIDESchedulerPUBLICATION SCHED-UM001F-EN-E–August 2007Supersedes Publication SCHED-UM001E-EN-PProduction ManagementINTEGRATED PRODUCTION &

Página 2

FACTORYTALK SCHEDULER USER’S GUIDE4• • • • •Get phone supportThe Rockwell Automation support team of outstanding professionals provides top-notch

Página 3 - Contents

FACTORYTALK SCHEDULER USER’S GUIDE94• • • • •developed is a “2 by 5 Pool 4,” which is what we need. If we attach this time pattern to our Labor re

Página 4 - 5 • Scheduling Concepts 39

7 • SCHEDULE ANALYSIS95• • • • •One might conclude that Case 8 provides the best results. It also yields one of the better values for the latest e

Página 5 - C • MRP Charts 111

FACTORYTALK SCHEDULER USER’S GUIDE96• • • • •would be the scheduling of a preventive maintenance activity or a breakdown, which only applies to on

Página 6 - Index 133

97AGlossaryActivity Area—a generic term for sites, areas, or lines within a production enterprise. An enterprise may contain one or more sites, which

Página 7 - Where do I begin?

FACTORYTALK SCHEDULER USER’S GUIDE98• • • • •Composite Time Pattern—a base pattern with exceptions that is used to define a shift pattern for a re

Página 8 - Reference the user’s guides

A • GLOSSARY99• • • • •generated to produce components or subassemblies to-stock that are required for manufacturing orders for finished products.

Página 9 - Get help online

FACTORYTALK SCHEDULER USER’S GUIDE100• • • • •Operation Constraint—a restriction placed on the duration, start, or end time of an operation. Opera

Página 10 - Get Web support

A • GLOSSARY101• • • • •Primary Resource—a resource that is specified as a primary resource at a work cell. Every work cell has a primary resource

Página 11 - Contact us

FACTORYTALK SCHEDULER USER’S GUIDE102• • • • •Resource Efficiency—alters the rate at which work is performed using a resource. The actual work dur

Página 12

A • GLOSSARY103• • • • •Time Pattern—a collection of calendar values, shift states, or other time patterns that have been assigned to specific blo

Página 13 - The BizBikes Factory

1 • WELCOME TO FACTORYTALK SCHEDULER5• • • • •Get on-site supportFor on-site support, Rockwell Automation field support engineers are located arou

Página 14 - BizBikes business problems

FACTORYTALK SCHEDULER USER’S GUIDE104• • • • •

Página 15 - Learn more about RSBizWare

105BProcess PlansSHP RED BICYCLESHP BLUE BICYCLESeq # Operation Work Cell Setup Time Process Time Additional Resources Notes 10 Assemble and Pack S

Página 16

FACTORYTALK SCHEDULER USER’S GUIDE106• • • • •SSD RED BICYCLESSD BLUE BICYCLESeq # Operation Work Cell Setup Time Process Time Additional Resour

Página 17 - The Factory Overview

B • PROCESS PLANS107• • • • •SHP RED FINISHED FRAMESHP BLUE FINISHED FRAMESSD RED FINISHED FRAMESeq # Operation Work Cell Setup Time Process Tim

Página 18

FACTORYTALK SCHEDULER USER’S GUIDE108• • • • •SSD BLUE FINISHED FRAMESHP FRAMESeq # Operation Work Cell Setup Time Process Time Additional Resou

Página 19

B • PROCESS PLANS109• • • • •SSD FRAMEHANDLEBAR ASSEMBLYHANDLEBARSeq # Operation Work Cell Setup Time Process Time Additional Resources Notes 1

Página 20

FACTORYTALK SCHEDULER USER’S GUIDE110• • • • •NECK POSTSEAT ASSEMBLYSEAT POSTSeq # Operation Work Cell Setup Time Process Time Additional Resour

Página 21

111CMRP ChartsSHP Red BicycleLEVEL: 0 LEAD TIME: 1SHP Blue BicycleLEVEL: 0 LEAD TIME: 1SSD Red BicycleLEVEL: 0 LEAD TIME: 1Period 2/10 2/11 2/12 2/13

Página 22 - Process plans

FACTORYTALK SCHEDULER USER’S GUIDE112• • • • •SSD Blue BicycleLEVEL: 0 LEAD TIME: 1SHP Red Finished FrameLEVEL: 1 LEAD TIME: 1 LOT SIZE: 24SHP Blu

Página 23 - SHP Red Finished Frame Plan

C • MRP CHARTS113• • • • •SSD Red Finished FrameLEVEL: 1 LEAD TIME: 1 LOT SIZE: 24SSD Blue Finished FrameLEVEL: 1 LEAD TIME: 1 LOT SIZE: 24Handleb

Página 24 - Handlebar Assembly Plan

FACTORYTALK SCHEDULER USER’S GUIDE6• • • • •

Página 25 - Neck Post Plan

FACTORYTALK SCHEDULER USER’S GUIDE114• • • • •Seat AssemblyLEVEL: 1 LEAD TIME: 1 LOT SIZE: 75Pedal and Chain AssemblyLEVEL: 1 LEAD TIME: 3 LOT SIZ

Página 26

C • MRP CHARTS115• • • • •WheelsLEVEL: 1 LEAD TIME: 3 LOT SIZE: 48Derailleur AssemblyLEVEL: 1 LEAD TIME: 4 LOT SIZE: 60Seat PostLEVEL: 2 LEAD TIME

Página 27 - Purchased components

FACTORYTALK SCHEDULER USER’S GUIDE116• • • • •HandlebarLEVEL: 2 LEAD TIME: 3 LOT SIZE: 100Neck PostLEVEL: 2 LEAD TIME: 3 LOT SIZE: 60SHP FrameLEVE

Página 28 - Previously scheduled orders

C • MRP CHARTS117• • • • •SSD FrameLEVEL: 2 LEAD TIME: 4 LOT SIZE: 50SeatLEVEL: 2 LEAD TIME: 2 LOT SIZE: 100Period 2/10 2/11 2/12 2/13 2/14 2/17 2

Página 29 -  Adjustable Pooled

FACTORYTALK SCHEDULER USER’S GUIDE118• • • • •

Página 30 - Resource sets

119DTime Pattern EditorsIn this appendix, we’ll introduce the three available time pattern editors and show you how to use them in the context of Fact

Página 31

FACTORYTALK SCHEDULER USER’S GUIDE120• • • • •3 hours, the machine would be available and processing at a 90% rate (capacity of 1 and efficiency o

Página 32 - AM to 2 PM, as shown below

D • TIME PATTERN EDITORS121• • • • •Now we’ll show you how to develop this time pattern under a different name. To do this, right-click in the Tim

Página 33 - AM on Day 2, as shown below

FACTORYTALK SCHEDULER USER’S GUIDE122• • • • •

Página 34 - AM PM AM

D • TIME PATTERN EDITORS123• • • • •We’ll leave the Default Value as the Unavailable state. Next click on the button to the right of the Duration

Página 35 - Sequencing constraints

72The BizBikes Factory Introducing BizBikesThis chapter describes a sample company, BizBikes Inc., whose manufacturing system will be referred to in u

Página 36

FACTORYTALK SCHEDULER USER’S GUIDE124• • • • •Accepting this dialog will populate the first row of the grid with your values. Note that the graph

Página 37

D • TIME PATTERN EDITORS125• • • • •the time span grid and assign the new My Shift 1 time pattern to the hours from 7 to 15 for Monday, as shown b

Página 38

FACTORYTALK SCHEDULER USER’S GUIDE126• • • • •The only difference between this new time pattern and the 2 By 5 Machine time pattern is that we did

Página 39

D • TIME PATTERN EDITORS127• • • • •The resulting 2 By 5 Pool 3 time pattern looks very similar to the 2 By 5 Machine time pattern, except for the

Página 40 - Material constraints

FACTORYTALK SCHEDULER USER’S GUIDE128• • • • •Now let’s assume that one of your resources performs at a 90% level. Let’s develop a new efficiency

Página 41

D • TIME PATTERN EDITORS129• • • • •be State and the Value to be the state Unavailable. Now use the drop-down arrows to open the calendar and set

Página 42 - Operation constraints

FACTORYTALK SCHEDULER USER’S GUIDE130• • • • •would want to attach the 2 By 5 Pool 3 time pattern to the Capacity selection of the Labor resource

Página 43

D • TIME PATTERN EDITORS131• • • • •

Página 44

FACTORYTALK SCHEDULER USER’S GUIDE132• • • • •

Página 45 - CHEDULING

133IndexAActiveX Data Objects (ADO)  1activity area  97activity-based costing  97additional resources  24, 97Adjust > Check Sequence menu o

Página 46 -  Find: A “good” schedule

FACTORYTALK SCHEDULER USER’S GUIDE8• • • • •BizBikes business problemsBizBikes has been losing market share to competitors due to both pricing pre

Página 47

FACTORYTALK SCHEDULER USER’S GUIDE134• • • • •composite time pattern  98constrained system modeling  23material  23operation  23resource

Página 48

INDEX135• • • • •GGantt chart  39good order  98HHandlebar  18Handlebar Assembly  18help online  3heuristic rules for sequencing  41Hi

Página 49

FACTORYTALK SCHEDULER USER’S GUIDE136• • • • •Adjust > Validate Op On Drop  76Database  61, 65, 93Database > Time Pattern > Composite

Página 50 - Simulation-based sequencing

INDEX137• • • • •predefined job preference rulesDynamic Highest Order Property Field  50Dynamic Lowest Order Property Field  50Highest Order

Página 51

FACTORYTALK SCHEDULER USER’S GUIDE138• • • • •Schedule Analyzer  80Schedule Analyzer menu option  80schedule evaluation  76Schedule File Ord

Página 52

INDEX139• • • • •Smallest Operation Slack Time  51Smallest Order Slack  56Smallest Order Slack Time  51Smallest Processing Time  52, 56Sm

Página 53 - Operation selection rules

FACTORYTALK SCHEDULER USER’S GUIDE140• • • • •Work-in-Process (WIP)  103www.rsbizware.com  9Zzero efficiency  27

Página 54

2 • THE BIZBIKES FACTORY 9• • • • •Learn more about RSBizWareSee how RSBizWare solutions impact the BizBikes manufacturing system by visiting www.

Página 55 - SELECTION

FACTORYTALK SCHEDULER USER’S GUIDE10• • • • •

Página 56 - Predefined Job Preference

113The Factory OverviewThe BizBikes manufacturing systemTo begin our assessment of the BizBikes factory, we’ll first examine their manufacturing syste

Página 57 - Minimum Job Tardiness

FACTORYTALK SCHEDULER USER’S GUIDE12• • • • •(frames, handlebars, etc.) as well as final assemblies. The components are produced to-stock and are

Página 58 - Maximum Facility Capacity

3 • THE FACTORY OVERVIEW13• • • • •Order # Product Name Order Quantity Release Date Due Date SHP Red 1 SHP Red Bicycle 15 2/11/03 11 PM 2/12/

Página 59

iiContact RockwellCustomer Support Telephone — 1.440.646.3434Online Support — http://www.rockwellautomation.com/supportCopyright Notice© 2007 Rockwell

Página 60 - Resource rules

FACTORYTALK SCHEDULER USER’S GUIDE14• • • • •The BizBikes manufacturing resourcesThe BizBikes manufacturing plant contains seven work cells (Cut,

Página 61

3 • THE FACTORY OVERVIEW15• • • • •ASSEMBLY AND PACKThese work cells are used to assemble and pack the finished BizBikes. The setup and process (p

Página 62

FACTORYTALK SCHEDULER USER’S GUIDE16• • • • •This matrix shows the setup time for an operation based on the previous production lot that was proce

Página 63

3 • THE FACTORY OVERVIEW17• • • • •The components required before this operation can be started are the manufactured parts SHP Red Finished Frame,

Página 64 - Custom sequencing

FACTORYTALK SCHEDULER USER’S GUIDE18• • • • •SHP Frame PlanHANDLEBAR ASSEMBLYThe process plans for the handlebar assembly contain a single subasse

Página 65 - Using FactoryTalk Scheduler

3 • THE FACTORY OVERVIEW19• • • • •adequate materials will be available. The process plan for Handlebar is summarized below.Handlebar PlanNECK POS

Página 66 - Set the planning horizon

FACTORYTALK SCHEDULER USER’S GUIDE20• • • • •SEAT ASSEMBLYThe process plans for the seat assembly contain a single subassembly operation. In this

Página 67 - Attach a database

3 • THE FACTORY OVERVIEW21• • • • •Purchased componentsIn addition to the manufactured components, we also have purchased components that are used

Página 68

FACTORYTALK SCHEDULER USER’S GUIDE22• • • • •InventoriesWe have a starting inventory level for both the manufactured and the purchased material. T

Página 69

234Scheduling FeaturesFactoryTalk Scheduler provides a wide range of features for modeling constrained scheduling systems. There are four basic catego

Página 70 - Create the fcs file

iii1 • Welcome to FactoryTalk Scheduler 1What is FactoryTalk Scheduler?. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Página 71 - Develop a schedule

FACTORYTALK SCHEDULER USER’S GUIDE24• • • • •also restrict what operations can be processed at the same time by requiring that certain operation a

Página 72

4 • SCHEDULING FEATURES25• • • • •called Assembly and Pack Area 1 and Assembly and Pack Area 2. We will associate a 1/5-shift pattern with all the

Página 73 - The Order Trace View window

FACTORYTALK SCHEDULER USER’S GUIDE26• • • • • Let us assume that FactoryTalk Scheduler is going to schedule an operation that requires a primary r

Página 74

4 • SCHEDULING FEATURES27• • • • •as shown below. Although this operation time is six hours, this particular process spans a nine-hour period beca

Página 75 - Use operation overlap

FACTORYTALK SCHEDULER USER’S GUIDE28• • • • •Although the operation could start at 4 PM, there is only one unit of labor available from 3PM to 9 P

Página 76 - Create named views

4 • SCHEDULING FEATURES29• • • • •Sequencing constraintsSequencing constraints are normally a part of the product or job routing and determine the

Página 77

FACTORYTALK SCHEDULER USER’S GUIDE30• • • • • all operations with lower root numbers and a fewer number of suffixes must precede that operation,

Página 78

4 • SCHEDULING FEATURES31• • • • •The second example extends the previous one by allowing two sets of parallel operations. In this example, the fi

Página 79

FACTORYTALK SCHEDULER USER’S GUIDE32• • • • •The third example illustrates how to use the numbering schemes to allow a series of operations to be

Página 80 - Manually edit a schedule

4 • SCHEDULING FEATURES33• • • • • 10.1.1.1(10)20.1.1.1(20)30.1.1(40)10.1.1.2(30)10.1.2(50)20.1.2(60)20.1.3.1(80)20.1.3.2(90)10.1.3(70)30.1.3(100)

Página 81

FACTORYTALK SCHEDULER USER’S GUIDEiv• • • • •Primary and additional resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Página 82 - Performance metrics

FACTORYTALK SCHEDULER USER’S GUIDE34• • • • •The final example illustrates a non-traditional network routing structure. Project management and mai

Página 83

4 • SCHEDULING FEATURES35• • • • •product bill of materials and indicates the amount of each material item required and where in the routing it is

Página 84

FACTORYTALK SCHEDULER USER’S GUIDE36• • • • •attempt to allow the scheduling of the initial item. If there are insufficient material-replenish ord

Página 85

4 • SCHEDULING FEATURES37• • • • •A similar feature allows an operation process time to have a resource product dependency.FactoryTalk Scheduler a

Página 86 - Schedule Analyzer

FACTORYTALK SCHEDULER USER’S GUIDE38• • • • •

Página 87

395Scheduling ConceptsFactoryTalk Scheduler incorporates both an algorithmic and a simulation-based scheduler. This chapter describes finite-capacity

Página 88

FACTORYTALK SCHEDULER USER’S GUIDE40• • • • •In this simple example, Job A consists of two operations that are defined by sequence numbers 10 and

Página 89

5 • SCHEDULING CONCEPTS41• • • • •repeats this process until all jobs (and therefore, all operations) have been loaded. Each operation is loaded o

Página 90 - FactoryTalk Scheduler reports

FACTORYTALK SCHEDULER USER’S GUIDE42• • • • •(due date and slack time) focus on reducing the number of late jobs, whereas the priority-based rule

Página 91

5 • SCHEDULING CONCEPTS43• • • • •Although the idea of constructing a schedule that has no late jobs is appealing, backward sequencing has some pr

Página 92

CONTENTSv• • • • •Set the planning horizon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60Attach

Página 93 - Schedule Analysis

FACTORYTALK SCHEDULER USER’S GUIDE44• • • • •as an available ranking order property. FactoryTalk Scheduler will automatically list all specified o

Página 94 - Forward scheduling

5 • SCHEDULING CONCEPTS45• • • • •SCHEDULING EXAMPLE 4The following sets of figures illustrate the simulation-based construction process. In each

Página 95

FACTORYTALK SCHEDULER USER’S GUIDE46• • • • •STEP 4: LOAD OPERATION B-20STEP 5: LOAD OPERATION C-20The first step in the simulation-based sequence

Página 96 - Simulation setup

5 • SCHEDULING CONCEPTS47• • • • •Selection rulesIn a simulation-based sequencer, there are two types of selection rules that can be applied each

Página 97

FACTORYTALK SCHEDULER USER’S GUIDE48• • • • •determines which operation to load. This rule is the key factor that determines the quality of the re

Página 98 - Backward scheduling

5 • SCHEDULING CONCEPTS49• • • • •and selects the desired operation using any appropriate logic. This type of rule gives complete flexibility in t

Página 99 - Adding pooled resources

FACTORYTALK SCHEDULER USER’S GUIDE50• • • • •Tardiness, Minimum Job Flow Times, and Maximum Facility Capacity. We will discuss each of these core

Página 100 - Analysis summary

5 • SCHEDULING CONCEPTS51• • • • •The predefined job preference rules are generally used in situations where the characteris-tic of the job (e.g.,

Página 101 - • • • • •

FACTORYTALK SCHEDULER USER’S GUIDE52• • • • •work (rather than number of operations) to be done. The basic premise is that the remaining slack tim

Página 102

5 • SCHEDULING CONCEPTS53• • • • •Maximum Facility Capacity category ignore the job due date and are focused on generating a schedule that is effi

Página 103 - Glossary

FACTORYTALK SCHEDULER USER’S GUIDEvi• • • • •SHP Blue Finished Frame . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Página 104

FACTORYTALK SCHEDULER USER’S GUIDE54• • • • •increase until no orders remain with the same or larger campaign value. When this occurs, the rule th

Página 105

5 • SCHEDULING CONCEPTS55• • • • • The Non-Bottleneck Earliest End Time rule selects the non-bottleneck resource that will complete the operation

Página 106

FACTORYTALK SCHEDULER USER’S GUIDE56• • • • • Fewest Remaining Operations (static): The operation whose job has the fewest remaining operations i

Página 107

5 • SCHEDULING CONCEPTS57• • • • • Campaign Sequence Cycle: The operation with the same or next highest (lowest) campaign value is selected. The

Página 108

FACTORYTALK SCHEDULER USER’S GUIDE58• • • • • Timed Least Setup With Campaign: The operation with the least setup time and the closest campaign v

Página 109

596Using FactoryTalk SchedulerIn Chapter 3 we introduced our tutorial system, and in Chapter 4 we discussed the basic FactoryTalk Scheduler modeling f

Página 110

FACTORYTALK SCHEDULER USER’S GUIDE60• • • • •Thus, the first time you load a new FactoryTalk Scheduler application, you will have to set up your p

Página 111 - Process Plans

6 • USING FACTORYTALK SCHEDULER61• • • • •Attach a databaseSelect the Database > Attach menu option to open the Connect To Database dialog that

Página 112

FACTORYTALK SCHEDULER USER’S GUIDE62• • • • •Select the database from the drop-down list (BizBikes) and click the Next button. The last dialog req

Página 113

6 • USING FACTORYTALK SCHEDULER63• • • • •Once all the data is read in, our resource names will be displayed down the left side of the Sequence Ov

Página 114

11Welcome to FactoryTalk SchedulerWelcome to FactoryTalk Scheduler, the state-of-the-art finite-capacity system that will help you gain control of you

Página 115 - ANDLEBAR

FACTORYTALK SCHEDULER USER’S GUIDE64• • • • •Now we’ll open the Unallocated Jobs window by using the View > Unallocated Orders/Operations windo

Página 116

6 • USING FACTORYTALK SCHEDULER65• • • • •and save the fcs file, these changes will automatically be used when you recall an application using the

Página 117 - MRP Charts

FACTORYTALK SCHEDULER USER’S GUIDE66• • • • •Unallocated Jobs Window and places them on the planning board. The resulting schedule is shown next.E

Página 118 - SHP Blue Finished Frame

6 • USING FACTORYTALK SCHEDULER67• • • • •The Attributes windowYou can get more information about each operation by placing your mouse cursor on a

Página 119 - Handlebar Assembly

FACTORYTALK SCHEDULER USER’S GUIDE68• • • • •If you want to view the schedule of the Handlebar 1 order in the context of the entire schedule, you

Página 120 - Pedal and Chain Assembly

6 • USING FACTORYTALK SCHEDULER69• • • • •When you activate this option, all operations that are not a part of the Handlebar 1 order are grayed ou

Página 121 - Seat Post

FACTORYTALK SCHEDULER USER’S GUIDE70• • • • •Labor resource and overlay the time patterns for the Labor and Cutter resources, your overview should

Página 122 - SHP Frame

6 • USING FACTORYTALK SCHEDULER71• • • • •use this procedure, your resulting Sequence Overview window, or the default Gantt view, should resemble

Página 123 - SSD Frame

FACTORYTALK SCHEDULER USER’S GUIDE72• • • • •This results in a new view being created and assigned the name “Fabrication.” Note that this is basic

Página 124

6 • USING FACTORYTALK SCHEDULER73• • • • •If you accidentally hide a resource that should be visible, simply right-click in the resource area of t

Página 125 - Time Pattern Editors

FACTORYTALK SCHEDULER USER’S GUIDE2• • • • •you to check the schedule performance against the defined objectives and adjust the schedule if necess

Página 126 - Developing a time pattern

FACTORYTALK SCHEDULER USER’S GUIDE74• • • • •Manually edit a scheduleOnce you develop a partial or complete schedule, you can also use the drag-an

Página 127 - Shift 1. Next, click on the

6 • USING FACTORYTALK SCHEDULER75• • • • •resource—the “Cut Neck Post” operation. Move it to the right and note the change in the window. A plus “

Página 128

FACTORYTALK SCHEDULER USER’S GUIDE76• • • • •If you have these other types of constraints, you can get information on their validity by selecting

Página 129

6 • USING FACTORYTALK SCHEDULER77• • • • •Orders are considered to be on time by comparing their order end dates/times to the order due date times

Página 130

FACTORYTALK SCHEDULER USER’S GUIDE78• • • • •Holding your cursor over the chart will display the legend. In this case, the bars represent the idle

Página 131

6 • USING FACTORYTALK SCHEDULER79• • • • •February 17 to midnight Saturday, February 22, we’ll get a more representative utilization chart. The n

Página 132

FACTORYTALK SCHEDULER USER’S GUIDE80• • • • •typical information that is included in most applications. These include two activity-based costing r

Página 133

6 • USING FACTORYTALK SCHEDULER81• • • • •Clicking on the Neck Post 2 order causes the operations of the order to be displayed in the operations s

Página 134 - 4. Select the Value type to

FACTORYTALK SCHEDULER USER’S GUIDE82• • • • •This window provides additional information on the selected operation. The upper-left part of the win

Página 135 - Attaching a time pattern

6 • USING FACTORYTALK SCHEDULER83• • • • •Close the Operation Constraints window and scroll down the on-time orders until you find the SHP Red 6 o

Página 136

1 • WELCOME TO FACTORYTALK SCHEDULER3• • • • •technical support group. Additionally, electronic copies of the FactoryTalk Scheduler Customization

Página 137

FACTORYTALK SCHEDULER USER’S GUIDE84• • • • •Now let’s turn our attention to the Material Prerequisites. This section lists all the materials requ

Página 138

6 • USING FACTORYTALK SCHEDULER85• • • • •A section of the Scheduled Orders report showing the orders due on 2/11/03 is shown below. In the actual

Página 139

FACTORYTALK SCHEDULER USER’S GUIDE86• • • • •Where desirable, the information in a report also can be displayed in a graphical format. For example

Página 140

877Schedule AnalysisIn Chapter 6, we covered the basic procedures for using the FactoryTalk Scheduler system. In this chapter, we will show you how to

Página 141

FACTORYTALK SCHEDULER USER’S GUIDE88• • • • •This filter option uses the data in the last auxiliary Boolean attribute field for orders to determin

Página 142

7 • SCHEDULE ANALYSIS89• • • • •This portion of the Baseline Comparison provides summary performance measures, much like the Performance Metrics w

Página 143

FACTORYTALK SCHEDULER USER’S GUIDE90• • • • •the third column show the relative percent of change between the two schedules using the base schedul

Página 144

7 • SCHEDULE ANALYSIS91• • • • •to the database. Thus, they will be lost when you exit the FactoryTalk Scheduler session. This method is best used

Página 145

FACTORYTALK SCHEDULER USER’S GUIDE92• • • • •Now if we develop a schedule using simulation, it will use these new rules. This results in a schedul

Página 146

7 • SCHEDULE ANALYSIS93• • • • •Now, use the Sequence > Forward > By Release Date menu option to schedule the remaining orders.Reviewing the