Rockwell-automation FactoryTalk Metrics User Guide Manual do Utilizador Página 228

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 272
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 227
Chapter 7 Advanced Reporting Topics
To schedule a report object to be run at a later time:
1. Open the Configuration Console.
2. On the Configure menu, click Scheduled Report Objects.
The Scheduled Report Objects dialog box appears.
3. Click Add.
The Schedule Wizard appears.
4. On the Report Object Selection wizard page, select a report
data source, a report object, and an optional filter.
The preview of the selected data appears.
5. Click Next.
The Description and Frequency page appears.
6. In the Task Description box, type the description of the task
that will be performed.
For this example, type Workcell Production Scheduled Task.
Schedule a Report Object
228 Rockwell Automation Publication PLTMT-UM001M-EN-P-June 2014
Vista de página 227
1 2 ... 223 224 225 226 227 228 229 230 231 232 233 ... 271 272

Comentários a estes Manuais

Sem comentários